14th Aug 2010
10h00 – The pan for the day is to correctly connected the underfloor heating on the upper mezzanine. So its of to Gien to buy paint for the Kitchen walls, a shade of orange that has to be mixed. … Continue reading
Posted in Uncategorized
Leave a comment
13th Aug 2010
09h30 – Today is the day for connecting up the upper mezzanine underfloor heating. I had bought all the parts last year. 14h00 – No a good job, soldering, push fits and screw fits in copped and PER (plastic). … Continue reading
Posted in Uncategorized
Leave a comment
12th Aug 2010
10h00 – So, its definitely the day to drain the heating system. This was achieved. The towel radiator in the kitchen was removed and laid outside on the table. This was a good opportunity to see how it … Continue reading
Posted in Uncategorized
Leave a comment
11th Aug 2010
10h00 – The plan for the day is to drain the heating system and change the central heating main pump. I do not have to drain the complete system to do this but P wants to finish decorating behind … Continue reading
Posted in Uncategorized
Leave a comment
10th Aug 2010
08h30 – Barry and Pat were off to Rouen today on their journey home to Wellingborough. After a good breakfast they left just before mid-day and were going via Paris. L’Echiquier web-site.