10h00 – The pan for the day is to correctly connected the underfloor heating on the upper mezzanine. So its of to Gien to buy paint for the Kitchen walls, a shade of orange that has to be mixed. I would also buy plumbing fitting and get a remote thermostatic head for the mezzanine heating, Comap brand. The real plumbing supplier is Gien was closed, it was Saturday so I bought what I could from Brico-marche. I got I think all the right bits and P got her paint.
16h00 – Great stuff, the upper mezzanine underfloor heating is working with no leaks.
19h00 – P is off to Joigny with Vero, more singing. I had a night in with the TV and Wallander in Swedish.