11th Aug 2010

10h00 – The plan for the day is to drain the heating system and change the central heating main pump.    I do not have to drain the complete system to do this but P wants to  finish decorating behind some radiators and the whole system could do with a good flush.

12h00 – The pump was changed very quickly with out draining, some 20 minutes, all went very well.

L’Echiquier web-site.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *